Solar PV Installation, Office Building Central Oxford - 11kWp
Client: Hoare Lee Engineering Consultancy
System Installed: Engineering consultancy firm Hoare Lee had us install this 11kWp system on their Central Oxford office, using SunPower Commercial modules linked to an externally mounted Solar Edge three phase inverter, with Modbus meter so they can show their clients how their electricity is being used on site.
System size: 11 kWp
Expected Annual Generation: 8662 kWh

Other Commercial installations by Oxford Solar PV

This 180kWp PV system on an industrial unit in Milton Keynes will generate approximately 160,000kWh of green electricity annually to help lower the occupier’s electricity bill...

This 143kWp PV system close to Heathrow Airport comprises 360 SunPower 400W commercial modules and two SolarEdge inverters and will generate approximately...

This 176kWp PV system comprising 450 SunPower 390W modules and 2 SolarEdge inverters will generate over 160,000kWh of green electricity annually, helping reduce...

Two 25kWp systems we installed for an Oxford flooring company, using Perlight modules linked to SMA Sunny Tri-Power inverters. They have seen significant reductions in...

A 30kWp agricultural system in rural Oxfordshire using SunPower commercial modules and a Solar Edge three phase inverter, helping this premises lower their energy...

On behalf of Oxford University Hospital Trust we installed this 20kWp system using SunPower modules linked to an SMA Sunny Tri-Power three phase inverter, mounted...

SunPower modules connected to an SMA Sunny Tri-Power three phase inverter generating over 25000kWh of clean electricity to help lower energy bills for this local...

This specially designed mounting system is for a 30kWp PV system using JA Solar smart modules connected to a Solar Edge three phase inverter, with remote monitoring...

2 Auriol Drive, a refurbished early-2000s warehouse in Greenford, London, sets a new industrial sustainability standard. With a BREEAM Outstanding rating, it proves existing buildings can meet modern environmental and operational needs. It is the world's first industrial refurbishment project to achieve BREEAM Outstanding status

Pasadena Distribution Centre

St Philip and St James School, Oxford

23kWp flat roof system. SunPower modules and Solar Edge inverter lowers energy bills. Monitoring via Modbus meter and Solar Edge portal.

11kWp system at a Central Oxford office. SunPower Commercial modules, an external Solar Edge inverter and Modbus meter to show how electricity is being used.

10kWp system at an office in Long Hanborough. SunPower modules and Solar Edge inverters lower their reliance on the grid and lower their carbon footprint.

SunPower modules and 2 No3 phase Solar Edge inverters with export limitation in place and Tesla Powerwall battery storage system.

SunPower commercial modules linked to 27.6kW Solar Edge inverter and Modbus meter for full remote reporting of on-site consumption.

SunPower commercial modules connected to a 27.6kW Solar Edge inverter with energy meter showing on site consumption data on display screen in the reception area.

Solar Edge Inverter with JA Solar modules, designed to generate in excess of 27000kWp of electricity annually to help power this hotel.


Get in touch
Contact us to learn more about Solar PV installations in Oxfordshire and beyond









